Project info

  • Client : Taxi Walter
  • Team : Dimitry, Nicolas, Raff
  • Service : High Voltage Installation
  • Category : High Voltage

High-voltage installation for Taxi Walter’s electrification in Zaventem.

To support the growing energy demand of their electric taxi fleet, Taxi Walter partnered with Reeload for a high-voltage infrastructure upgrade. From feasibility to installation, we delivered a future-proof solution that enables fast, efficient, and scalable charging capacity on-site. The system is built to grow with Taxi Walter’s operations—offering both immediate power capacity and long-term flexibility. Whether for additional chargers or battery integration down the line, the infrastructure is designed with tomorrow in mind.

A future-proof energy
upgrade for daily operations.

Reeload handled the entire technical process—ensuring compliance, cost-efficiency, and readiness for long-term electric mobility growth.

High-voltage enabled

Grid-ready installation above 160 kW.

Fleet-ready capacity

Built to support multiple EV chargers.

Full installation

From groundwork to final commissioning.

Scalable setup

Prepared for future energy expansion.

Final view of this project